27
May
Posted by Seabrook in 2010 Ultimate Beach House | Tags :basement, bathroom tiles, breezeway, cabinets, construction, countertops, courtyard, exterior, faucets, fireplace, guest house, interior, seabrook cottage rentals, shower, shower heads, tiles, washington coast vacation rentals | No Comments
Remember the countertops and cabinets we talked about being installed in the Coastal Living Magazine Ultimate Beach House? Well, most of them are in place and we’ve got all the pictures for you!
The vanity countertops you see are silestone countertops of the highest quality. Brizo faucets sit on top of them and give the house a classy, authentic look.
Showers and shower heads have also been put in place in all bathrooms in the idea house. Tile work has been completed as well and tiles from Pacific Tile are now in the bathrooms in the Ultimate Beach House.
On the exterior, Azek decks and railings are popping up in the courtyard and front porch. Pictures of that below as well.
As you can see, landscapers are working in the courtyard and around the house since we are nearing the construction deadline that is set for June 15.
One month later, on July 16, the Coastal Living Magazine Ultimate Beach House will be all finished on both the interior and exterior, and will be open for tours through October 30.
If you would like to visit Seabrook and tour the idea house, visit Seabrook Cottage Rentals to book your stay!
Enjoy the picture updates below!


Main Floor Cabinets & Countertops


Basement Cabinets & Countertops


Spa Steam Shower

First Floor Main Bedroom Bathroom



First Floor Main Bathroom





Guest House



Courtyard & Fireplace



Landscaping



1
Apr
Posted by Seabrook in 2010 Ultimate Beach House, Pictures | Tags :armstrong, exquisite surfaces, exterior, hardwood floors, idea house, interior, ocean view, oceanfront, paint, progress, siding, ultimate beach house, walls | 1 Comment
It’s been an exciting couple of weeks for the Coastal Living Ultimate Beach House and we have some great pictures to share with you!
As you can see, the siding of the South side of the idea house is completed, and the siding of the guest house and garage is almost done too.
The interior of the house continues to see rapid progress as well. The hardwood floors provided by Armstrong are in place on the first and second floor of the house, with only the stairs left to cover up.
The walls in the basement and second floor have been primed for paint and really complete the look of the rooms, as you can see in the pictures below.
Tiles, provided by the our sponsor Exquisite Surfaces, should be put in the bathrooms and kitchen starting next week.
Subscribe to the blog to stay tuned for our weekly updates from the Washington Coast!



Living Room


Kitchen


Hardwood Floors on Second Floor


Upstairs Bedroom


Master Bedroom


Primed Walls & Ceilings


