Hardwood Floors In, Walls Primed For Paint


It’s been an exciting couple of weeks for the Coastal Living Ultimate Beach House and we have some great pictures to share with you!

As you can see, the siding of the South side of the idea house is completed, and the siding of the guest house and garage is almost done too.

The interior of the house continues to see rapid progress as well. The hardwood floors provided by Armstrong are in place on the first and second floor of the house, with only the stairs left to cover up.

The walls in the basement and second floor have been primed for paint and really complete the look of the rooms, as you can see in the pictures below.

Tiles, provided by the our sponsor Exquisite Surfaces, should be put in the bathrooms and kitchen starting next week.

Subscribe to the blog to stay tuned for our weekly updates from the Washington Coast!

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Living Room

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Kitchen

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Hardwood Floors on Second Floor

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Upstairs Bedroom

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Master Bedroom

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House


Primed Walls & Ceilings

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House

2010 Coastal Living Ultimate Beach House